Chewelah Peak Learning Center
Construction Updates
About the Facility
The 2007 Legislature allocated $1 million
toward the $1.45 million needed for construction of
a second dorm at Chewelah Peak Learning Center. The new dorm
will add 50 to 75 beds and will allow Chewelah Peak to better
meet the capacity required for the majority of schools interested
in using the Learning Center.
Construction began in July of 2007; the new dorm should
be ready for use in spring of 2008.
To view our existing
facilities, visit the Chewelah
Peak Learning Center Photo Gallery.
Architectural Drawings for Dorm B
|
|

|
Architects drawing of the new Dorm Complex: Dorm B
(left), The Gathering Place (center) and Dorm C (right.) Dorm
B Construction began July 2007. The other two building are
still awaiting funding.
|
Dorm B is located east of the Learning
Studio and will add 50 to 75 additional beds. The dorm should be
completed in the Spring of 2008. Pictures will be added as
construction progresses.
|
Current Construction Photos for Dorm B
June 2008: Dorm B is now
complete!
|

Front
view of the dorm (from the
field). Ready
for sleepy visitors!

Side view from the library
patio.
Left, dorm A; Center, lodge and library; Right,
Dorm B

View of the west half of the
dorm.
View of Dorm B from the library fire pit area.
|
|
May 2008: All beds are
built!

|

|
March 2008: Interior
photos of Dorm B.

Sleeping
area in the west half of the
dorm.
West side sleeping area from another view.

The
bathroom
sinks.
Bed supplies stored in the east half of the dorm.
|
|
|
February 2008: Interior and
exterior photos of Dorm B.

Front
doors were added on February
8.
Sink backsplash is now ready for the sinks.

Staff
bedroom interior (1 of
2.) Tile
work in shower stalls is still in progress.
|
Last updated March 31, 2008